Skip to content

RTEco

Heavy Metal Removal Plant

RT ECO® series Hybrid Advanced Wastewater treatment system offer you the solution for the removal of heavy metals like Copper, Silver, Zinc, Cadmium, Gold, Mercury, Lead, Chromium, Iron, Nickel, Tin, Arsenic, Selenium, Molybdenum, Cobalt, Manganese, and Aluminium and more. With RT ECO® advanced Heavy Metal Removal Plant severe problems including the waste water containing hazardous heavy metals deteriorating the ground water can be avoided.

Models

Model Treatment capacity (m3/day)
RT ECO MR-5
5
RT ECO MR-10
10
RT ECO MR-20
20
RT ECO MR-30
30
RT ECO MR-40
40
RT ECO MR-50
50
RT ECO MR-60
60
RT ECO MR-100
100

Heavy metal pollution has become one of the most serious problems today. There is the large threat posed by the discharge of toxic heavy metal like Copper, Chromium, Nickel, Lead into the environment through many metal finishing (electroplating) operations like printed circuit board production shops.

Mining, Metal plating, foundry and metal finishing wastewater effluent containing high load of metals, being very corrosive and relative high temperatures makes the Mining operations and smelters often struggle to meet discharge limits for heavy metals into ocean, rivers, lakes etc.

RT ECO helps the detoxification of industrial effluents for environmental protection and recovery of valuable metals emanating from various nonferrous processing industries and limits the toxic contaminants from waste water in an efficient as well as economical way.

RT ECO electro-chemical metal removal system comprises electrocoagulation as primary treatment removes dissolved metals and electro-oxidation as secondary treatment process . RT ECO, electro-chemical effluent treatment systems are fully automatic, skid mounted, designed for continuous operation which converts effluent into reusable water.

Input - Output Parameters for Biomedical Liquid Waste Treatment RT ECO Plant

Parameter Liquid Waste Treated water
COD (mg/L)
600
250
TSS (mg/L)
300
50
BOD (mg/L)
250
30

Brochure Download

RT ECO Heavy Metal Removal Plant

Submit your inquiry
Please enable JavaScript in your browser to complete this form.

Resources

Construction of Electro Coagulation and Electro-Oxidation based RT ECO Effluent Treatment Skid in 24 Hours

Please fill the form in English and provide us the datas to serve you better. Please fill the details clearly in the boxes provided and email us with your requirement.